SMM2 ON PILING WORKS

E.4.1(a) : an item shall be given for bringing to site and removing from site all plant required for this section of work.

E.4.1.(b) : An item shall be given for maintaining on site all plant required for this section of the work.

E.5.3 : …..item shall be given for :
(a) The total number of piles stating the specified length. The size and weight of head and shoes shall be stated in the description

E.5.7 : In the case of pile extensions, item shall be given for :

(b) The total length of pile extensions given in metres classified into the following ranges of pile length:

not exceeding 3.0m
exceeding 3.0m

E.5.3 : The total driven depth given in metres

E.5.7 (a) : The total number of pile extensions

E.5.9 : The following shall be enumerated :
(a) Cutting off tops ….

E.7 : Item shall be given for test of pile stating the detail